Tanzania Rural Low Voltage Transmission Project
LOCATION
Tanzania
PROJECT SCOPE
Tanzania Rural Low Voltage Transmission Project
REQUIRED PRODUCT
320 kilometers of 3+1 cores overhead insulated ABC Cable, 316 kilometers of 1+1 cores overhead insulated overhead insulated ABC Cable, 132 kilometers of galvanized steel wire, 572 kilometers of aluminum concentric cable, and 86 kilometers of copper low voltage power cable
REQUIREMENT & SOLUTION
In 2017, JYTOP successfully won the bid for the rural power transmission project from REA Power Company for Mbeya and Pwani two districts in Tanzania . For this project, we mainly supplies 320 kilometers of 3+1 cores overhead insulated ABC Cable, 316 kilometers of 1+1 cores overhead insulated overhead insulated ABC Cable, 132 kilometers of galvanized steel wire, 572 kilometers of aluminum concentric cable, and 86 kilometers of copper low voltage power cable and so on.