Tanzania Rural Low Voltage Transmission Project

LOCATION

Tanzania

PROJECT SCOPE

Tanzania Rural Low Voltage Transmission Project

REQUIRED PRODUCT

320 kilometers of 3+1 cores overhead insulated ABC Cable, 316 kilometers of 1+1 cores overhead insulated overhead insulated ABC Cable, 132 kilometers of galvanized steel wire, 572 kilometers of aluminum concentric cable, and 86 kilometers of copper low voltage power cable

REQUIREMENT & SOLUTION

In 2017, JYTOP successfully won the bid for the rural power transmission project from REA Power Company for Mbeya and Pwani two districts in Tanzania . For this project, we mainly supplies 320 kilometers of 3+1 cores overhead insulated ABC Cable, 316 kilometers of 1+1 cores overhead insulated overhead insulated ABC Cable, 132 kilometers of galvanized steel wire, 572 kilometers of aluminum concentric cable, and 86 kilometers of copper low voltage power cable and so on.

Related Products:

FAST AND RELIABLE SERVICE FOR YOUR PROJECT

Contact our trained experts today to find your perfect power solution.

Request a quote